• Initial Elementary Attendance Boundary Options
    Updated 9/30/2015
     
    Please carefully review each of the elementary attendance boundary options, currently under consideration for the 2016-17 school year. For each option there is a PDF map (that can be enlarged), a brief description of some of the areas impacted by the change, and a table with projected classroom availability at each school for the next three years.
     
    After reviewing all the options please use the link to Survey #1 at the bottom of the page to provide feedback. The Elementary Boundary Review committee will use this feedback to determine a "short list" of options to further study and present at community meetings on October 20th and 21st and via the website. Note that additional scenarios may be generated based on feedback from the community.
     
    To enlarge the maps below, click on the image and zoom in using the  "+" button in your browser. Or, save the map as a PDF and use Adobe Acrobat Reader to zoom in on the maps. Either option should allow a viewer to enlarge the maps enough to view street names.
     
    Regarding the capacity projection tables below, a "0" indicates that a school is essentially at its anticipated program capacity. Unused classrooms may be utilized for district programs such as the Parent Partnership Program or other needs.
     
    Option A
     Option A
    Brief description of changes in Option A:
    • Moves the Mount Si Road and parts of North Bend Way to NBES (from OES)
    • Moves Deer Park and Aster Creek to Elem 6 (from NBES)
    • Moves Eagle Point area and SE Vaughn to Elem 6 (from FCES)
    • Moves the Heights and area "K-North" to CVES (from SES)
    • Moves Eagle Lake area, Crestview, Bandara and Eagles Nest to Elem 6 (from CVES)
    • Moves south Fairway Ave area, including area around Aspen Village, to Elem 6 (from CVES)
    • Moves Stellar Way, Jay and Osprey courts, and southwest portion of Douglas Ave to Elem 6 (from CVES)
    Option A: Three-Year Capacity Projections
    Option A
     
    -------------------------------------------------------------------------------------------------------------------------------------
    Option B1
     Option B1
    Brief description of changes in Option B1:
    • Moves the Mount Si Road and parts of North Bend Way to NBES (from OES)
    • Moves Deer Park and Aster Creek to Elem 6 (from NBES)
    • Moves Eagle Point area and SE Vaughn to Elem 6 (from FCES)
    • Moves the Heights and area "K-North" to Elem 6 (from SES)
    • Moves Stellar Way, Jay and Osprey courts, and southwest portion of Douglas Ave to Elem 6 (from CVES)
       
      Option B1: Three-Year Capacity Projections
    B1
     
    -------------------------------------------------------------------------------------------------------------------------------------
    Option B2
    Option B
    Brief description of changes in Option B2:
    • Moves the Mount Si Road and parts of North Bend Way to NBES (from OES)
    • Moves Deer Park and Aster Creek to Elem 6 (from NBES)
    • Moves Eagle Point area and SE Vaughn to Elem 6 (from FCES)
    • Moves the Heights and area "K-North" to Elem 6 (from SES)
    Option B2: Three-Year Capacity Projections
    B2  
     
    ------------------------------------------------------------------------------------------------------------------------------------- 
    Option C1
    Option C1  
    Brief description of changes in Option C1:
    • Moves Cedar Village and Riverbend to NBES (from OES)
    • Moves Deer Park and Aster Creek to Elem 6 (from NBES)
    • Moves Eagle Point area and SE Vaughn to Elem 6 (from FCES)
    • Moves the Heights and area "K-North" to Elem 6 (from SES)
    • Moves Stellar Way, Jay and Osprey courts, and southwest portion of Douglas Ave to Elem 6 (from CVES)
    • Moves Moon Valley to SES (from NBES)
    Option C1: Three-Year Capacity Projections 
      C1
     
    ------------------------------------------------------------------------------------------------------------------------------------- 
    Option C2
    Option C2
    Brief description of changes in Option C2:
    • Moves Cedar Village an Riverbend to NBES (from OES)
    • Moves Deer Park and Aster Creek to Elem 6 (from NBES)
    • Moves Eagle Point area and SE Vaughn to Elem 6 (from FCES)
    • Moves the Heights and area "K-North" to Elem 6 (from SES)
    • Moves SE 96th St.and 365th Ave SE (in Snoqualmie) and Echo Lake area to Elem 6 (from SES)

    Option C2: Three-Year Capacity Projections

    C2  
     
     -------------------------------------------------------------------------------------------------------------------------------------
    Middle School "Feeder" Opportunity:  All five options above support a consistent future middle school "feeder" pattern. In the fall of 2019, the District will return to three middle schools; the Freshman Campus will be converted back into Snoqualmie Middle School when the new Mount Si High School opens. At that time, all of the options above will allow for two elementary schools to "feed" into one middle school.The Elementary Boundary Review committee has been studying this topic and is likely to recommend to the School Board the following, beginning in the fall of 2019:
    • Elem 6 and FCES students to attend Chief Kanim Middle School (CKMS)
    • OES and NBES students to attend Twin Falls Middle School (TFMS)
    • SES and CVES students to attend Snoqualmie Middle School (SMS)
     
    Share your feedback:  Survey #1 closed on Wednesday, October 7, at noon. Based on feedback received, the committee will be providing another update online with a short list of preferred options and another survey to gather feedback. Watch for an update to be posted the week of October 12.